HWY SUMNER RD over TR GREEN LINE D

OVER GREEN LINE · County 021, Massachusetts · Built 1927 · 2 Lanes · 3,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B270034ULMBTNBI
Year Built
1927
Length
11 m (36.1 ft)
Max Span
9.8 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
3,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$1,200,000
Total Project Cost
$1,801,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.