HWY WASHNGTON ST over TR GREEN LINE D

OVER GREEN LINE · County 021, Massachusetts · Built 1884 · 5 Lanes · 22,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B270054UNMBTNBI
Year Built
1884
Reconstructed
1927
Length
9.6 m (31.5 ft)
Max Span
8.5 m
Width
28.7 m (94.2 ft)
Lanes
5
Daily Traffic
22,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$1,864,000
Total Project Cost
$2,797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.