HWY LONGWOOD AVE over WATER MUDDY RIVER

.8 KM N OF JCT SR9&JWAY · County 025, Massachusetts · Built 1897 · 3 Lanes · 14,700 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B161923F2DOTNBI
Year Built
1897
Length
30.5 m (100.1 ft)
Max Span
30.5 m
Width
18.4 m (60.4 ft)
Lanes
3
Daily Traffic
14,700
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,720,000
Total Project Cost
$5,581,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.