HWY MINER ST over TR GREEN LINE D

GREEN LINE/FENWAY STA POR · County 025, Massachusetts · Built 1906 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B16495AAHMBTNBI
Year Built
1906
Reconstructed
1977
Length
12.8 m (42 ft)
Max Span
9.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Channel Beam
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$684,000
Total Project Cost
$1,027,000