HWY BOYLSTON ST over WATER MUDDY RIVER

.2 MI W OF MASS AVE · County 025, Massachusetts · Built 1881 · 4 Lanes · 51,600 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B161884FCDOTNBI
Year Built
1881
Length
19.2 m (63 ft)
Max Span
19.2 m
Width
30.4 m (99.7 ft)
Lanes
4
Daily Traffic
51,600
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,948,000
Total Project Cost
$5,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.