HWY MASS AVE over COMB I 90 & MBTA/CSX

.32 KM S. CHARLES RV S54 · County 025, Massachusetts · Built 1965 · 4 Lanes · 21,206 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B160514T5DOTNBI
Year Built
1965
Length
49.4 m (162.1 ft)
Max Span
18.3 m
Width
29 m (95.1 ft)
Lanes
4
Daily Traffic
21,206
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,414,000
Total Project Cost
$14,122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.