HWY COMM AV OFRP over WATER MUDDY RIVER

.2 MI S OF ST RTE 2A · County 025, Massachusetts · Built 1965 · 2 Lanes · 7,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B163654FDDOTNBI
Year Built
1965
Length
84.8 m (278.2 ft)
Max Span
22.3 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
7,300
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,595,000
Total Project Cost
$17,393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.