HWY BEACON ST over WATER MUDDY RIVER

.32 KM W OF JCT BEACON&2A · County 025, Massachusetts · Built 1900 · 3 Lanes · 8,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B16018397DOTNBI
Year Built
1900
Reconstructed
1982
Length
16.5 m (54.1 ft)
Max Span
8.2 m
Width
21.6 m (70.9 ft)
Lanes
3
Daily Traffic
8,300
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,384,000
Total Project Cost
$3,577,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.