HWY BWKR NB OFRP over HWY STRRW DR WB ON RMP

.2 MI S OF ST RTE 2A · County 025, Massachusetts · Built 1965 · 2 Lanes · 16,971 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B163654FJDOTNBI
Year Built
1965
Reconstructed
2016
Length
45.7 m (149.9 ft)
Max Span
21.3 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
16,971
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,658,000
Total Project Cost
$3,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.