HWY BWKR SB ONRP over WATER MUDDY RIVER

.2 MI S OF ST RTE 2A · County 025, Massachusetts · Built 1965 · 2 Lanes · 18,470 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B163654FGDOTNBI
Year Built
1965
Length
68.5 m (224.7 ft)
Max Span
22.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
18,470
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,256,000
Total Project Cost
$6,385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.