HWY BWKR SB ONRP over HWY KENMORE OFF RMP

.2 MI S OF ST RTE 2A · County 025, Massachusetts · Built 1965 · 1 Lanes · 9,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B163654FFDOTNBI
Year Built
1965
Length
152.4 m (500 ft)
Max Span
21.3 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
9,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,822,000
Total Project Cost
$19,234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.