HWY CARLTON ST over COMB I 90 & CSX/MBTA

AT STORROW DRIVE S48A · County 021, Massachusetts · Built 1965 · 4 Lanes · 29,741 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B270184RCDOTNBI
Year Built
1965
Reconstructed
1994
Length
61.6 m (202.1 ft)
Max Span
22.3 m
Width
19.9 m (65.3 ft)
Lanes
4
Daily Traffic
29,741
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,010,000
Total Project Cost
$12,016,000