HWY JAMAICAWAY over OTHER PEAT BOG

.16 KM S OF HUNTINGTON AV · County 025, Massachusetts · Built 1937 · 4 Lanes · 48,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B162298XXDOTNBI
Year Built
1937
Reconstructed
1992
Length
92.7 m (304.1 ft)
Max Span
9.4 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
48,750
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,008,000
Total Project Cost
$21,013,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.