HWY CENTRE ST over COMB AMTRAK/MBTA & ORNG

BTWN TERRACE & COLUMBUS · County 025, Massachusetts · Built 1982 · 4 Lanes · 5,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B160954VCMBTNBI
Year Built
1982
Length
34.4 m (112.9 ft)
Max Span
16.8 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
5,400
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$1,909,000
Total Project Cost
$2,864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.