HWY PRENTISS ST over COMB AMTRAK/MBTA & ORNG

1ST BR S OF RUGGLES ST · County 025, Massachusetts · Built 1981 · 2 Lanes · 5,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B160894V9MBTNBI
Year Built
1981
Length
24.7 m (81 ft)
Max Span
13.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
5,450
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$2,143,000
Total Project Cost
$3,215,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.