HWY CHSTNT HL AV over TR GREEN LINE D

RESERVOIR STATION · County 021, Massachusetts · Built 1958 · 4 Lanes · 19,097 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B270014UJMBTNBI
Year Built
1958
Reconstructed
2004
Length
10.5 m (34.4 ft)
Max Span
9.3 m
Width
64.6 m (211.9 ft)
Lanes
4
Daily Traffic
19,097
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$4,614,000
Total Project Cost
$6,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.