HWY HAMMOND ST over TR GREEN LINE D

0.28 MI NOTH OF RTE 9 · County 017, Massachusetts · Built 1893 · 2 Lanes · 9,681 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N120324TUMBTNBI
Year Built
1893
Reconstructed
1991
Length
18.7 m (61.4 ft)
Max Span
17.1 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
9,681
Material
Steel
Design
Truss - Thru
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.