HWY PARKER ST over ST 9 BOYLSTON ST
2.1 MI. EAST RTE. 128 · County 017, Massachusetts · Built 1932 · 2 Lanes · 20,302 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.319017, -71.194389
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 94 years old.
Nearby Bridges
HWY ROGERS ST over TR GREEN LINE D
Built 1906
HWY CENTRE ST over TR GREEN LINE D
Built 1907
HWY WALNUT ST over TR GREEN LINE D
Built 1906
ST 9 BOYLSTON ST over HWY CENTRE ST
Built 1932
HWY HERRICK RD over TR GREEN LINE D
Built 1907
ST 9 BOYLSTON ST over TR GREEN LINE D
Built 1905
HWY LANGLEY RD over TR GREEN LINE D
Built 1907
HWY HAMMOND PD over TR GREEN LINE D
Built 1933
ST 9 BOYLSTON ST over HWY HAMMOND POND PKWY
Built 1933
HWY HIGHLAND AVE over WATER CHARLES RIVER
Built 1875
Bridge Details
- Structure #
- N120532LGDOTNBI
- Year Built
- 1932
- Length
- 21 m (68.9 ft)
- Max Span
- 9.1 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 20,302
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,614,000
- Total Project Cost
- $3,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.