HWY PARKER ST over ST 9 BOYLSTON ST

2.1 MI. EAST RTE. 128 · County 017, Massachusetts · Built 1932 · 2 Lanes · 20,302 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N120532LGDOTNBI
Year Built
1932
Length
21 m (68.9 ft)
Max Span
9.1 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
20,302
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,614,000
Total Project Cost
$3,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.