ST 9 BOYLSTON ST over TR GREEN LINE D

2.3 KM ELY RT 128 · County 017, Massachusetts · Built 1905 · 4 Lanes · 96,206 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
N120402EEDOTNBI
Year Built
1905
Reconstructed
1960
Length
17.1 m (56.1 ft)
Max Span
15.2 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
96,206
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,493,000
Total Project Cost
$9,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.