ST 9 BOYLSTON ST over WATER CHARLES RIVER

NEWTON-WELLESLEY TWN LINE · County 017, Massachusetts · Built 1900 · 6 Lanes · 51,270 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N120042EBDOTNBI
Year Built
1900
Reconstructed
1932
Length
23.2 m (76.1 ft)
Max Span
15.2 m
Width
49.1 m (161.1 ft)
Lanes
6
Daily Traffic
51,270
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,651,000
Total Project Cost
$11,477,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.