I 95 /ST128 over ST 9 WORCESTER ST

RT 128 AT RT 9 · County 021, Massachusetts · Built 2018 · 8 Lanes · 174,384 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W13023BDHDOTNBI
Year Built
2018
Length
51.4 m (168.6 ft)
Max Span
25.1 m
Width
47.1 m (154.5 ft)
Lanes
8
Daily Traffic
174,384
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.