HWY CENTRAL AVE over WATER CHARLES RIVER

NEEDHAM/NEWTON TOWN LINE · County 021, Massachusetts · Built 1860 · 2 Lanes · 22,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N0400133PMUNNBI
Year Built
1860
Reconstructed
2016
Length
26.2 m (86 ft)
Max Span
8.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
22,500
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,049,000
Total Project Cost
$3,074,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.