HWY HIGHLAND AVE over I 95 /ST128

1.3 KM SE OF ST 9 · County 021, Massachusetts · Built 2018 · 6 Lanes · 47,844 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N04021BBVDOTNBI
Year Built
2018
Length
126.2 m (414 ft)
Max Span
43.7 m
Width
32.1 m (105.3 ft)
Lanes
6
Daily Traffic
47,844
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.