ST 9 BOYLSTON ST over HWY CENTRE ST
1.5 MI ELY RT 128 · County 017, Massachusetts · Built 1932 · 4 Lanes · 82,758 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.319403, -71.206944
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 94 years old.
Nearby Bridges
ST 9 BOYLSTON ST over TR GREEN LINE D
Built 1905
HWY WALNUT ST over TR GREEN LINE D
Built 1906
HWY ROGERS ST over TR GREEN LINE D
Built 1906
HWY PARKER ST over ST 9 BOYLSTON ST
Built 1932
HWY CENTRE ST over TR GREEN LINE D
Built 1907
HWY HERRICK RD over TR GREEN LINE D
Built 1907
ST 9 BOYLSTON ST over HWY CHESTNUT ST
Built 1932
HWY HIGHLAND AVE over WATER CHARLES RIVER
Built 1875
ST 9 BOYLSTON ST over HWY QUINOBEQUIN RD
Built 1932
ST 9 BOYLSTON ST over WATER CHARLES RIVER
Built 1900
Bridge Details
- Structure #
- N120512EDDOTNBI
- Year Built
- 1932
- Length
- 29 m (95.1 ft)
- Max Span
- 28.3 m
- Width
- 18.9 m (62 ft)
- Lanes
- 4
- Daily Traffic
- 82,758
- Material
- Steel
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,681,000
- Total Project Cost
- $5,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.