ST 9 BOYLSTON ST over HWY CENTRE ST

1.5 MI ELY RT 128 · County 017, Massachusetts · Built 1932 · 4 Lanes · 82,758 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
N120512EDDOTNBI
Year Built
1932
Length
29 m (95.1 ft)
Max Span
28.3 m
Width
18.9 m (62 ft)
Lanes
4
Daily Traffic
82,758
Material
Steel
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,681,000
Total Project Cost
$5,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.