HWY KINGS BRIDG over WATER QUABOAG RIVER

1MI S OF JCT I90&RT67 · County 013, Massachusetts · Built 2012 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B24012B5LMUNNBI
Year Built
2012
Length
45.7 m (149.9 ft)
Max Span
44.5 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
1,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,065,000
Total Project Cost
$4,598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.