HWY DNHN PLMR RD over WATER FOSKETT MILL STRM

0.3MI N OF RT 20 NEAR PAL · County 013, Massachusetts · Built 1956 · 2 Lanes · 429 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B2401016NMUNNBI
Year Built
1956
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
429
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$603,000
Total Project Cost
$905,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.