HWY WASHNGTON RD over WATER BOTTLE BROOK

1.4 MI N OF RT 20 · County 013, Massachusetts · Built 1956 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B24052170MUNNBI
Year Built
1956
Length
8.1 m (26.6 ft)
Max Span
7.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$263,000
Total Project Cost
$395,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.