I 90 WB over ST 67 BOSTON RD

MM 66.5 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 23,561 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
P010554MADOTNBI
Year Built
1957
Reconstructed
1984
Length
65.4 m (214.6 ft)
Max Span
23.8 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
23,561
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,828,000
Total Project Cost
$8,743,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.