MM 66.7 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 24,191 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B240614KXDOTNBI
Year Built
1957
Reconstructed
1984
Length
236.2 m (774.9 ft)
Max Span
27.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
24,191
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,954,000
Total Project Cost
$28,432,000