ST 3 NB over US 6

@ CAPE COD CANAL · County 001, Massachusetts · Built 2006 · 3 Lanes · 26,567 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B170275YKDOTNBI
Year Built
2006
Length
35.4 m (116.1 ft)
Max Span
32.2 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
26,567
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,715,000
Total Project Cost
$4,073,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.