HWY BOURNE CR CN over ST 25

0.4 M N OF BOURNE BRIDGE · County 001, Massachusetts · Built 1985 · 2 Lanes · 7,880 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B17026457DOTNBI
Year Built
1985
Length
82.6 m (271 ft)
Max Span
40.8 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
7,880
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,876,000
Total Project Cost
$2,815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.