HWY BOURNEDAL RD over ST 25

1.4 M N OF BOURNE BRIDGE · County 001, Massachusetts · Built 1987 · 2 Lanes · 3,621 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B170254AFDOTNBI
Year Built
1987
Length
63.3 m (207.7 ft)
Max Span
30.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
3,621
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,128,000
Total Project Cost
$7,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.