ST 25 EB over HWY BOURNE RD

1.4 M E OF WAREHAM TL · County 023, Massachusetts · Built 1987 · 3 Lanes · 31,940 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
P13044458DOTNBI
Year Built
1987
Length
28.3 m (92.8 ft)
Max Span
27.4 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
31,940
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,276,000
Total Project Cost
$4,915,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.