ST 3 SB/PLGRM HWY over HWY HERRING POND RD

1 M N OF BOURNE TL · County 023, Massachusetts · Built 1957 · 2 Lanes · 13,357 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P13039491DOTNBI
Year Built
1957
Reconstructed
1978
Length
27.7 m (90.9 ft)
Max Span
25.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
13,357
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,364,000
Total Project Cost
$3,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.