I 93 NB RAMP CL over OTHER RELIEF

RAMP N. OF GILMORE BRIDGE · County 025, Massachusetts · Built 1999 · 2 Lanes · 17,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B166029E7DOTNBI
Year Built
1999
Length
54.9 m (180.1 ft)
Max Span
31 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
17,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$86,000
Total Project Cost
$130,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.