I 93 NB B5-B10 over COMB MBTA & I 93 SB

.8 MI N OF RAMP I93&US1 · County 025, Massachusetts · Built 1970 · 3 Lanes · 69,748 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162813DYDOTNBI
Year Built
1970
Length
167.6 m (549.9 ft)
Max Span
42.4 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
69,748
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,614,000
Total Project Cost
$30,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.