I 93 SB B10-B16 over RR MBTA/BMRR

1 MI N OF JCT I93&US1 · County 025, Massachusetts · Built 1970 · 3 Lanes · 57,435 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162813EEDOTNBI
Year Built
1970
Length
134.7 m (441.9 ft)
Max Span
23.2 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
57,435
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,250,000
Total Project Cost
$22,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.