I 93 RAMP NS over RR MBTA

I93 US1 INTERCHANGE · County 025, Massachusetts · Built 1999 · 2 Lanes · 31,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166049THDOTNBI
Year Built
1999
Length
27.6 m (90.6 ft)
Max Span
27.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
31,000
Material
Steel
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,000
Total Project Cost
$67,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.