I 93 RAMPS SN NS over RR MBTA

I93 US1 INTERCHANGE · County 025, Massachusetts · Built 1999 · 3 Lanes · 60,517 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166059TXDOTNBI
Year Built
1999
Length
132.3 m (434.1 ft)
Max Span
44.8 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
60,517
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,010,000
Total Project Cost
$9,016,000