I 93 NB RAMP CL over OTHER RELIEF

RAMP N. OF GILMORE BRIDGE · County 025, Massachusetts · Built 1999 · 2 Lanes · 17,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166029E2DOTNBI
Year Built
1999
Length
182.3 m (598.1 ft)
Max Span
46 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
17,800
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$286,000
Total Project Cost
$430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.