I 93 SB BT 57-61 over RR MBTA & BMRR

.5 MI N OF JCT 193&US1 · County 025, Massachusetts · Built 1970 · 3 Lanes · 85,975 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B162813BUDOTNBI
Year Built
1970
Length
102.1 m (335 ft)
Max Span
25.3 m
Width
27.3 m (89.6 ft)
Lanes
3
Daily Traffic
85,975
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,255,000
Total Project Cost
$27,383,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.