I 93 & RMP SA-CN over WATER CHARLES RIV/RAMPS

N OF TD GARDEN · County 025, Massachusetts · Built 2002 · 10 Lanes · 155,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B166009PMDOTNBI
Year Built
2002
Length
444.2 m (1457.3 ft)
Max Span
227.1 m
Width
55.9 m (183.4 ft)
Lanes
10
Daily Traffic
155,200
Material
Steel
Design
Stayed Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$161,492,000
Total Project Cost
$242,239,000