I 93 NB over I 93 SB/RMP LT/MIL RV

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2002 · 4 Lanes · 79,712 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B16600901DOTNBI
Year Built
2002
Length
309.4 m (1015.1 ft)
Max Span
44.2 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
79,712
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$36,830,000
Total Project Cost
$55,246,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.