US 1 RAMP TC over COMB I93 RMP NS & MBTA

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2002 · 3 Lanes · 51,207 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B163928XWDOTNBI
Year Built
2002
Length
135 m (442.9 ft)
Max Span
55.2 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
51,207
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,874,000
Total Project Cost
$7,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.