I 93 RAMP SA-CN over HWY ACCESS RD

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2003 · 2 Lanes · 29,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166039PGDOTNBI
Year Built
2003
Length
74.7 m (245.1 ft)
Max Span
42.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
29,700
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,713,000
Total Project Cost
$14,570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.