I 93 RAMP N-S over COMB MGH PKNG & MBTA
LEVERETT CIR-UNIT 2 · County 025, Massachusetts · Built 1999 · 2 Lanes · 35,899 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.367453, -71.063108
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 27 years old.
Nearby Bridges
I 93 RAMP S-N over RR MBTA
Built 1999
I 93 RAMP SA-CN over HWY ACCESS RD
Built 2003
I 93 RAMP N-S over COMB NASHUA ST&MGH PKNG
Built 1999
I 93 & RMP SA-CN over WATER CHARLES RIV/RAMPS
Built 2002
I 93 NB RAMP S-N over HWY NASHUA ST
Built 2005
I 93 RAMP N-S over OTHER RELIEF
Built 1999
I 93 RAMP LC-N over HWY NASHUA ST
Built 2005
I 93 RAMP S-N over OTHER RELIEF
Built 2005
I 93 RAMP N-S over I 93 RAMP LC-S TUNNEL
Built 1999
I 93 STRRW DR CON over WATER CHARLES RIVER
Built 1999
Bridge Details
- Structure #
- B16606633DOTNBI
- Year Built
- 1999
- Length
- 180.7 m (592.8 ft)
- Max Span
- 43.3 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 35,899
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,716,000
- Total Project Cost
- $2,575,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.