I 93 RAMP S-N over OTHER RELIEF
RAMP STORROW DR. TO I93N · County 025, Massachusetts · Built 2005 · 1 Lanes · 8,800 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.36605, -71.06475
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 21 years old.
Nearby Bridges
I 93 RAMP N-S over OTHER RELIEF
Built 1999
I 93 RAMP LC-N over HWY NASHUA ST
Built 2005
I 93 RAMP N-S over I 93 RAMP LC-S TUNNEL
Built 1999
I 93 NB RAMP S-N over HWY NASHUA ST
Built 2005
I 93 RAMP N-S over COMB NASHUA ST&MGH PKNG
Built 1999
I 93 RAMP LC-N over I 93 RAMP S-N BOAT
Built 2003
I 93 RAMP S-N over RR MBTA
Built 1999
I 93 RAMP N-S over COMB MGH PKNG & MBTA
Built 1999
ST 28 LEVERETT CIR over HWY EMBANKMENT RD WB
Built 1952
I 93 RAMP SA-CN over HWY ACCESS RD
Built 2003
Bridge Details
- Structure #
- B1661968UDOTNBI
- Year Built
- 2005
- Length
- 62.2 m (204.1 ft)
- Max Span
- 21.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 1
- Daily Traffic
- 8,800
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $827,000
- Total Project Cost
- $1,241,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.