I 93 RAMP LC-N over I 93 RAMP S-N BOAT

UNIT 1 · County 025, Massachusetts · Built 2003 · 1 Lanes · 12,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166916K2DOTNBI
Year Built
2003
Length
120.7 m (396 ft)
Max Span
44.6 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
12,400
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$715,000
Total Project Cost
$1,073,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.