ST 1 A over HWY CHELSEA & BREMEN S

1000FT NE OF CALLHAN TUN. · County 025, Massachusetts · Built 1951 · 6 Lanes · 56,669 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B1623539TDOTNBI
Year Built
1951
Reconstructed
1977
Length
115.8 m (379.9 ft)
Max Span
25.3 m
Width
28.4 m (93.2 ft)
Lanes
6
Daily Traffic
56,669
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,388,000
Total Project Cost
$32,083,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.