ST 1 A/SB over OTHER RELIEF & PED WALKW

.16 KM N OF CALLAHAN TUN · County 025, Massachusetts · Built 1951 · 3 Lanes · 43,178 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B162353A0DOTNBI
Year Built
1951
Reconstructed
2005
Length
211.5 m (693.9 ft)
Max Span
22.6 m
Width
13.9 m (45.6 ft)
Lanes
3
Daily Traffic
43,178
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,131,000
Total Project Cost
$28,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.